On Going Projects » IBB ENERGY FROM WASTE PLANT

Location                              : EYUP / ISTANBUL

Client / Contractor               : ISTAC / Teknokon Endustri

Supplier                              : Hitachi-Zosen-Inova

Scope                                  :

  • Insatallation of  Process Steel Structure CSP [ 6.300 TON ]
  • Insatallation of Process Steel Structure FGT [ 790 TON ]
  • Insatallation of Process Steel Structure WSC [ 495 TON ]
  • Insatallation of Process Steel Structure BOP [ 180 TON ]
  • Insatallation of Process Steel Structure EIC [ 110 TON ]
  • Gratings erection quantity [ 12.750 SQM ]
  • Railings erection quantity [ 11.730 M ]
  • Insatallation of CSP Building cable trays [ 2.250 Meter ]

 

Start date                              : JUNE  2019

Completion date                   : On going

 