Completed » Anagold - Çöpler Sulphide Expansion Project

Proje Yeri           : İLİÇ / ERZİNCAN

İşveren                : GAP – TEKNOKON ENDÜSTRİ

Tedarikçi             : Amec Foster Wheeler

 

Kapsam               :

 

  • STEEL STRUCTURE INSTALLATION [ 2.150 TON ]
  • PVC PIPING INSTALLATION [ 5.340 METRE ]
  • STEEL PIPING INSTALLATION [ 18.750 WDI ]
  • CONDUIT INSTALLATION  [ 1.270 METRE ]
  • TUBING PIPING INSTALLATION [ 2.430 METRE ]
  • CABLE TRAY INSTALLATION [ 2.750 METRE ]
  • REAGENT & ELUTION BUILDING STATIC AND ROTATING EQUIPMENTS INSTALLATION

[ 530 TON ]

 

Başlangıç            : JULY 2017

Bitiş                      : DECEMBER 2018

 