Proje Yeri : İLİÇ / ERZİNCAN
İşveren : GAP – TEKNOKON ENDÜSTRİ
Tedarikçi : Amec Foster Wheeler
Kapsam :
- STEEL STRUCTURE INSTALLATION [ 2.150 TON ]
- PVC PIPING INSTALLATION [ 5.340 METRE ]
- STEEL PIPING INSTALLATION [ 18.750 WDI ]
- CONDUIT INSTALLATION [ 1.270 METRE ]
- TUBING PIPING INSTALLATION [ 2.430 METRE ]
- CABLE TRAY INSTALLATION [ 2.750 METRE ]
- REAGENT & ELUTION BUILDING STATIC AND ROTATING EQUIPMENTS INSTALLATION
[ 530 TON ]
Başlangıç : JULY 2017
Bitiş : DECEMBER 2018